Products and services

WORKSHOP №2. Assembling, maturation and ground tests of aviation materiel

Manufacturing area of workshop:
  • Hangar building №5 with a total area 3435 m²;
  • Structure for testing of fuel system - 346 m² in area);
  • Escape System repair building - 328 m² in area.

Assembly of detachable aircraft units and equipment, their running-in, performing ground tests of the aircraft.
Assembly of detachable aircraft units and equipment, their running-in, performing ground tests of the aircraft
Testing of fuel system after assembly
Testing of fuel system after assembly
Start and running up of the engines with ground control panels
Start and running up of the engines with ground control panels
Final adjustment of Ш-101 system
Final adjustment of Ш-101 system
Leveling of the aircraft
Leveling of the aircraft

The latest developments